___________________________________________________________________________________________________ SERAPID to provide the customer: quote budgeting quote
Estimated timetable of project (installation): 30-60 days 60-90 days 90-120 days over 120 days
Is there any additional information about this project, which cannot be attached here, but is required for preparing a quotation ? no yes ___________________________________________________________________________________________________ Press information: mfg : model : stroke : tonnage : s.p.m. : shut height :
style : new OBI existing straightside retrofit rebuild other tonnage, strip force : RAM : bolster :
Press bed (bolster) information : bolster size : F-B : L-R : thickness : does the bed have T-slots : yes no T-slot orientation : F-B L-R other, attach drawing do the T-slots run the entire length : yes no other, attach drawing number of T-slots on bed : spacing :
dimension of T-slots :
bed (bolster) height from floor :
Press slide (RAM) information : ram size : F-B : L-R : thickness : does the RAM have T-slots : yes no T-slot orientation : F-B L-R other, attach drawing do the T-slots run the entire length : yes no other, attach drawing number of T-slots on RAM : spacing :
dimension of RAM T-slots :
_________________________________________________________________________________________________ Standardisation program implemented ? yes no clamping height : sub-plates shut height plate size thickness : __________________________________________________________________________________________________ Die (mold or tool) information : maximum weight : upper : lower : die set material : upper : lower : dimensions : maximum F-B x L-R minimum F-B x L-R tool shut height : maximum minimum type of clamping currently used : if bolts, number of bolts used to clamp dies : bolt size : dies are loaded from : front back left side right side are dies on parallels ? yes no if yes, please provided drawings total number of dies involved: average number of die changes per shift : currently : objective : ___________________________________________________________________________________________________ Application information : type of process : stamping molding high speed high temperature other type of stamping : blanking drawing deep draw forming other type of operation : manual transfer auto transfer progressive other ___________________________________________________________________________________________________ Die lifters : select die lifter type : quote recommend not required hydraulic mechanical rollers balls ___________________________________________________________________________________________________ Die support rails (bolster extensions) :
select bolster extension type : quote recommend not required removable pivoting double pivoting sliding __________________________________________________________________________________________________ Clamping for the bed (bolster) :
quote recommend not required clamp type : fixed position removable
Clamping for the slide (RAM) :
quote recommend not required clamp type : fixed position removable ___________________________________________________________________________________________________